the borealis community yoga & cafe project:
2018 - 2020
Plan:
Build out the 2,500 SF basement and 800 SF first floor of a 135-year-old building in downtown Medford Square, Massachusetts
Basement: Build 2 yoga studios, 3 bathrooms, and an office
First floor: Build a small eat-in/take-out bistro cafe
Results:
After 2+ years of build-out, borealis community yoga opened in November 2019
Due to COVID, borealis closed 4 months later in March 2020
-
Entrepreneur-at-work
-
Historic 20 High Street, built c. 1885
-
20 High Street - 2020
-
borealis community yoga, 28 High Street, Medford, MA 02155
-
Plans for lower level: 2 studios, 3 bathrooms, 2 offices, one lift/elevator
-
Plans for first floor cafe
-
Empty lower level. Dirt floors before plastic, rebar and concrete pouring
-
Hillside studio to be: concrete floors down, waterproof walls to be done
-
Hillside studio framing underway
-
Hillside studio before flooring
-
Hillside studio finished with flooring
-
Cubby blooper. No problem.
-
In Hillside studio looking through to the windows of Riverside studio
-
Welcome area with Riverside studio left and Hillside studio right
-
Welcome area w/Naama - finished
-
3 bathrooms framed and rough plumbed
-
3 bathrooms installed
-
Riverside studio - unfinished
-
Riverside studio - underway
-
Naama and Em happy in Riverside after installing flooring
-
Riverside studio finished
-
Riverside studio finished
-
Hillside studio water issue #3 of endless
-
Riverside studio - water issue #1 of endless
-
Yoga with dogs
-
Rough draft of café kitchen
-
Rough draft of café seating for Health Department
-
Café before walls and floors
-
Café as a welcome area
-
Naama welcoming guests